-
Tips for becoming a good boxer - November 6, 2020
-
7 expert tips for making your hens night a memorable one - November 6, 2020
-
5 reasons to host your Christmas party on a cruise boat - November 6, 2020
-
What to do when you’re charged with a crime - November 6, 2020
-
Should you get one or multiple dogs? Here’s all you need to know - November 3, 2020
-
A Guide: How to Build Your Very Own Magic Mirror - February 14, 2019
-
Our Top Inspirational Baseball Stars - November 24, 2018
-
Five Tech Tools That Will Help You Turn Your Blog into a Business - November 24, 2018
-
How to Indulge on Vacation without Expanding Your Waist - November 9, 2018
-
5 Strategies for Businesses to Appeal to Today’s Increasingly Mobile-Crazed Customers - November 9, 2018
Talgo train successfully completes Delhi-Mumbai trail run at 150 kmph
The superfast train completed the journey under 12 hours, that was set as the targeted time.
Advertisement
It was the final run of Talgo train on Delhi-Mumbai route.
Mumbai: The Spanish Talgo train completed its final trail run between Delhi and Mumbai today.
The train decreased the minimum travelling time by four hours as Rajdhani express takes 15 hours and 50 minutes at a speed of 130kmph to cover the same distance between the same destinations. Traversing the 1,384 km stretch between New Delhi and Mumbai, the train – travelling at a speed of 140 km per hour – reached at 3.15 am instead of scheduled arrival at 2.57 am. Talgo aims to reduce travel time between the two cities by four hours. The train consists of nine coaches including two executive class cars, four chair cars, a cafeteria, a power auto and a tail-end coach for staff and equipment.
In July 2015, Talgo had approached the Indian Railways with a proposal to build the fastest train using light weight coaches. The speciality of the coaches is that they can hit 200 km per hour and have a natural tilting mechanism which allows them to be dragged on curves at a faster speed than other Indian coaches..
The high speed Talgo trains have been under-going trials since May.
Advertisement
After the Bareilly and Moradabad route trial, the train was test-run on the route between Mathura and Palwal for around 40 days with speed up to 180 km per hour.